A productive work session Saturday, March 15th, we made repairs to several things in anticapation of the show at the NWSS complex in just a couple of weeks
The group made the following repairs:
Fixed trailer wiring ground issue restoring lights and power to the jack.
"Canyon right" module backdrop topper that got dropped was repaired (touch-up paint next session
Inspected and repaired all the module legs
Installed ISE Squeeler in a "Canyon right" module.
Many thanks to Wilbur, Allen, Dino, Steve, Kieran, Dave S. and Dave R. for joining the session today.